Sewage pump peak load­coverage

Product category
-
Applications
Series/measurand
Control input / needs signalling
Data Sheets
-
Task

Two pumps are installed at a sewage pumping station that are to be run alternately for equal periods to ensure equal wear.

Solution description

The pump switchover system activates the pumps alternately; if needed, the second pump can also be activated so that both run at the same time (parallel operation)

Benefit/added value

– Equal wear, and therefore longer service intervals for both pumps
– Minimised pump failures through nearly equal number of operating hours
– Peak load coverage
– Zero-voltage safety in the event of power failures

Product
G2ASMA20
Powered By TELE
TELE_FactoryHub_Logo_woVienna
organisation-playground
If you are unable to access the TELE Website, please send an email to one of the following contacts:

Technical requests: support@tele-haase.at

Returns: rma@tele-haase.at

Other requests: info@tele-haase.at

Requests in regards to USA: sales@tele-controls.com

Or please use one of the following browsers!