Task

Two pumps are installed at a sewage pumping station that are to be run alternately for equal periods to ensure equal wear.

Solution description

The pump switchover system activates the pumps alternately; if needed, the second pump can also be activated so that both run at the same time (parallel operation)

Benefit/added value

– Equal wear, and therefore longer service intervals for both pumps
– Minimised pump failures through nearly equal number of operating hours
– Peak load coverage
– Zero-voltage safety in the event of power failures

Product
G2ASMA20
Powered by TELE
Logo Factory Hub Vienna
Logo The Organisation Playground
If you are unable to access the TELE Website, please send an email to one of the following contacts:

Technical requests: support@tele-haase.at

Returns: rma@tele-haase.at

Other requests: info@tele-haase.at

Requests in regards to USA: sales@tele-controls.com

Or please use one of the following browsers!