Emergency­ power supply

Product category
-
Applications
Series/measurand
Voltage monitoring
Data Sheets
-
Task

It must be ensured that the emergency power system is switched on within 30 ms when the lighting power supply fails.

Solution description

By monitoring the supply voltage with the E3YF400, the emergency power system is activated within 20 ms in the event of a power failure.

Benefit/added value

– Fulfilment of the legal requirement through rapid changeover to emergency power

Product
E3YF400V
Powerd by TELE
Logo Factory Hub Vienna
Logo The Organisation Playground
Sei kein Gefangener der Vergangenheit:
Internet Explorer ist für unsere Technologie zu alt!
Bitte verwende einen der folgenden Browser!