MenuProduct searchSearch
Home » Applications » Emergency­ power­ monitoring

Emergency­ power­ monitoring

Phase failure for the operating theatre ventilation systems in hospitals is to be recognized and switched over to an emergency generator
Industry:
Energy distribution
Series/Measures
Voltage monitoring
Product:
E3YF400VFAL 02
Data sheet:
Task:
Phase failure for the operating theatre ventilation systems in hospitals is to be recognized as quickly as possible and the system is to be switched over to an emergency generator in such an event. The customer wishes to have 2 contacts to signal the use of emergency power immediately.
Solution
This device was used because it reacts to phase failure within 20 seconds and recognises undervoltage and overvoltage.
Use/value:
- Rapid power supply fault detection according to VDE 0126-1-1
- 2 contacts

This might be of interest for you