Monitoring of­ supply pumps

Produktkategorie
-
Anwendungen
Serie/Messgröße
Rotating field, phase failure
Datenblätter
-
Aufgabenstellung

Ensuring the correct rotation direction for the supply pump in a hydropower plant.

Lösungsbeschreibung

By monitoring the connected phases for failure and phase sequence, any error status is detected.
If the the rotating field is connected incorrectly when the pump is put into operation, the supply pump does not start.
The rapid detection of phase failure must be ensured in order to prevent the motor and thus the pump from being damaged.

Nutzen/Mehrwert

– Prevention of overload in the event of incorrect running direction and shutdown
– Safe detection and shutdown in the event of phase failure

Produkt
E1PF400VSY01
Powered by TELE
Logo Factory Hub Vienna
Logo The Organisation Playground
Sollten Sie die TELE Webseite nicht aufrufen können wenden Sie sich bitte per Email an einen der folgenden Kontakte:

Technische Anfragen: support@tele-haase.at

Retouren: rma@tele-haase.at

Sonstige Anfragen: info@tele-haase.at

Anfragen betreffend die USA: sales@tele-controls.com

Oder verwenden Sie bitte einen der folgenden Browser!